Unit-Turn and Capex Budget Template (XLSX and PDF)
This unit turn budget template prices a make-ready line by line, and a second tab converts roof, boiler and other component lives into an annual per-unit reserve. Bring both totals to a lender. The per-unit replacement reserve JFG underwrites is underwritten file by file, ask your loan officer, so your own schedule is the number you can defend.
What is in the unit-turn and capex budget
Two budgets in one workbook: the cost to turn each unit, and a building-level capital schedule that converts roof, boiler and other big-ticket lives into an annual per-unit reserve.
Sheet: Unit Turns
Line-item make-ready budget, one block per unit type.
| Column | What goes in it |
|---|---|
| Scope item | Text. |
| Quantity | Whole number. |
| Unit of measure | Text. |
| Cost per unit of measure | Dollar amount. |
| Line total | Calculated by the sheet. |
| Units getting this scope | Whole number. |
| Extended total | Calculated by the sheet. |
| Notes | Text. |
The workbook ships with 13 sample rows to show the format, plus 8 blank rows.
- Interior paint, walls and trim (per sq ft)
- Flooring: remove and replace (per sq ft)
- Kitchen cabinets: replace or refinish (per linear ft)
- Countertops (per linear ft)
- Appliances: range, refrigerator, hood (per each)
- Bath: vanity, toilet, tub or surround (per each)
- Plumbing fixtures and shutoffs (per each)
- Light fixtures, switches and outlets (per each)
- Interior doors and hardware (per each)
- Window treatments and screens (per each)
- Smoke and CO detectors (per each)
- Cleaning and trash-out (per unit)
- Contingency (per lump sum)
How to fill it in:
- Price each line from a contractor bid or your own invoices, not a rule of thumb.
- Units getting this scope lets one block cover a light turn on some units and a full renovation on others.
- Vacancy during the turn is a cost. Add the weeks offline to your lease-up plan.
Sheet: Building Capex
Capital schedule and the annual reserve it implies.
| Column | What goes in it |
|---|---|
| Component | Text. |
| Year installed | Whole number. |
| Expected useful life (years) | Whole number. |
| Remaining life (years) | Calculated by the sheet. |
| Replacement cost today | Dollar amount. |
| Annual reserve needed | Calculated by the sheet. |
| Planned year | Whole number. |
| Notes | Text. |
- Roof
- Boiler or furnaces
- Domestic water heaters
- Central air or unit condensers
- Windows
- Exterior: masonry, siding, paint
- Porches, stairs, balconies, fire escapes
- Parking lot and walks
- Electrical service and panels
- Plumbing risers and sewer line
- Common-area flooring and lighting
- Laundry equipment (if owned)
Computed for you:
- Annual reserve needed, whole building
- Annual reserve needed, per unit
How to fill it in:
- Useful lives come from your inspector or contractor. Enter them; the sheet does not assume any.
- The per-unit figure is your own estimate of what the building needs each year. Compare it to the per-unit replacement reserve a lender underwrites, which is set file by file.
- Anything with zero remaining life is not a reserve item. It is a closing-year capital cost and belongs in your cash-to-close.
On a bridge-to-DSCR plan, the Unit Turns total is the renovation budget and the Building Capex total is what the takeout lender will ask about. Bring both.
The workbook answers two questions that owners tend to blur. What will it cost to get these apartments rent-ready? And what will the building itself demand over the next decade? A lender asks them separately, so the file keeps them on separate tabs.
Which owners need both tabs
Buyers of a building that needs work need both on day one: the Unit Turns total is the renovation budget, and the Building Capex total shows what is left to fund after it. Start the capex tab during building due diligence, while the inspector is on the roof and in the boiler room.
Owners of a stabilized building can skip straight to the capex tab. Its per-unit figure is your own estimate to set beside the reserves for replacement a lender deducts from NOI.
Pricing the Unit Turns tab from bids and counts
Walk the units before you open the file. Then:
- Measure once per floor plan. Square feet of wall and floor, linear feet of cabinet and counter. Quantities repeat across identical units.
- Get a written bid per trade, priced per square foot, per linear foot or per item, so it drops into the cost column unchanged.
- Set the unit count per line. While auditing leases against the rent roll you will see which leases end soon. Those units are the ones you can reach first.
- Add what the template cannot know: permits, dumpsters, and the weeks each unit sits empty.
- Total it and divide by units renovated. That per-unit figure is what a bridge lender compares with the rent increase you are projecting.
Phasing follows the leases. The order of work and the lease-up that follows are laid out in the guide to stabilizing a value-add building.
Remaining life: the install date is only a starting point
The capex tab computes remaining life from the year installed plus the expected life you enter. That is arithmetic. A professional condition assessor works differently. Fannie Mae’s instructions for the property condition assessment it requires on its loans define remaining life as expected life minus effective age, and effective age is the consultant’s judgment of the component as it stands, whatever year it went in.
Use that idea. A 12-year-old boiler with no service records may deserve an older installed year than the nameplate shows. A 20-year-old roof that was recoated and drains well may deserve a newer one. Change the Year installed cell to reflect condition and say why in the notes. In master-metered walk-ups, the heating plant row usually decides the whole schedule.
Sorting every line into one of three buckets
Agency lenders sort physical needs by urgency, and the buckets are worth borrowing:
| If the item is… | Treat it as… | Fannie Mae’s rule for its own loans |
|---|---|---|
| A life-safety or critical repair, or a code violation | Cash at or right after closing | Critical repairs completed within 6 months of origination |
| Deferred maintenance | First-year budget | Completed within 12 months of origination |
| A component with years of life left | Annual reserve | Reserve sized from the condition report’s cost estimates |
| Routine or cosmetic repair | Operating expense | Not payable from the replacement reserve |
Source: Fannie Mae, Multifamily Selling and Servicing Guide, Section 405: Completion/Repairs and Section 408.04I, read November 2026.
The same guide refuses small loans where required repairs exceed 10 percent of the loan balance. A private lender’s line will differ, but the point holds: a building with a long first-bucket list is a bridge loan, not a permanent one.
Pre-1978 buildings: lead-safe work changes the paint and window lines
If the building predates 1978, the paint, window, door and trim lines carry a federal rule. EPA’s Renovation, Repair and Painting program requires any firm paid to disturb painted surfaces in such housing to be certified and to use trained workers. EPA states that the rule reaches landlords and property management companies working on their own rentals. Ask each bidder for its firm certificate, and expect containment and cleanup to show in the price.
Repair or improvement on the tax return
The worksheet is a budget, not a tax schedule, but the two meet. The IRS tangible property regulations treat a cost as an improvement, which is capitalized, when it betters the property, restores it or adapts it to a new use, and they test the building structure and each building system separately. Publication 527 depreciates a residential rental building over 27.5 years and appliances and carpet over five. Give your CPA the workbook with invoices attached and let them classify the lines.
What a bridge or takeout lender wants attached
Send the bids behind the Unit Turns tab, photos of each unit type, the inspection report behind the capex tab and your phasing plan. On a bridge request, JFG’s 5+ unit bridge loan page describes the financing, quoted at 8.99%–13.5% interest-only. Test the exit before you commit to the scope with the takeout planning tool.
Where an owner’s budget runs out
Your schedule is an estimate by someone with a stake in the answer. It will not satisfy a lender that orders its own condition report, and it cannot see inside walls, under slabs or down a sewer line. Structural movement, failing plumbing risers and environmental problems need an engineer, a scope and a real bid. Budget for those reports first. More working files are on the page of spreadsheets and checklists.
Questions and answers
How much contingency should the Unit Turns tab carry?
There is no published standard, so set it from what you do not know. Units you have walked and priced from a written bid need little. Units you have not seen, or buildings with old plumbing behind the walls, need more. Enter contingency as its own lump-sum line so a lender can see it, and say in the notes column what it is meant to absorb.
My roof is three years past its expected life. What does the Building Capex tab do with it?
Remaining life floors at zero and the annual reserve cell shows the full replacement cost, because the sheet divides by one year at minimum. Read that as a signal, not a reserve. A component with no life left is a cost for this year: move it to your cash-to-close or renovation budget, enter the planned year, and start a fresh row for the new roof once it is on.
Can one Unit Turns block cover both light turns and full renovations in a 14-unit building?
Yes. The column for units getting each scope does that job. Paint and cleaning might apply to all 14, flooring to nine, and cabinets and counters to five. Each line extends on its own count, so the tab's total is the building budget. If two renovation levels differ on most lines, copy the block and keep one per level so the bids stay readable.
Does a new water heater in one apartment count as a repair or a capital item?
For your budget, put it on the capex tab: it has a multi-year life and will come around again. For taxes the answer depends on your facts. IRS Publication 527 lists a water heater among its examples of improvements, but the de minimis safe harbor election can let an owner with no applicable financial statement deduct items costing $2,500 or less per invoice. Ask your CPA which applies.
Will a lender accept my capex schedule in place of a property condition report?
It depends on the lender and the loan. Fannie Mae requires its lenders to obtain a property condition assessment on nearly every loan, prepared under its own instructions, so an owner's schedule never substitutes there. JFG's property condition standards are underwritten file by file. In either case a documented schedule with bids behind it shortens the conversation about deferred maintenance.
Sources
- Multifamily Selling and Servicing Guide, Section 404: Property Condition Assessment (PCA). Fannie Mae, 2026.
- Multifamily Selling and Servicing Guide, Section 405: Completion/Repairs. Fannie Mae, 2026.
- Multifamily Selling and Servicing Guide, Section 408.04I: Items Not Eligible for Funding from the Replacement Reserve. Fannie Mae, 2026.
- Lead Renovation, Repair and Painting Program. U.S. Environmental Protection Agency, 2026-11-12.
- Tangible Property Final Regulations. Internal Revenue Service, 2026-08-04.
- Publication 527: Residential Rental Property. Internal Revenue Service, 2025.