Multifamily DSCR LoansPublished by Jaken Finance Group Get Multifamily DSCR Terms
Free download

Apartment Building Due Diligence Checklist

This apartment building due diligence checklist lists what to verify between contract and closing on a 5 to 50 unit purchase, grouped by who holds each record: seller, tenants, the building, the county, your insurer and your lender. Its last section tests the loan, because a 5+ unit building must carry 1.20–1.25 coverage on lender NOI.

Download PDF Free, no email required. Version 1.0, updated November 25, 2026. Published by Jaken Finance Group.

What is in the apartment building due diligence checklist

What to verify between contract and closing on a small apartment building, grouped by who you need to get it from. Built for a 5 to 50 unit purchase; most of it applies to a duplex too.

Financial records (from the seller)

  • T-12 and the two prior calendar years of operating statements
  • Rent roll at contract and again within a week of closing
  • Bank statements or deposit ledger for the same 12 monthsCollections on the T-12 should tie to deposits.
  • Utility bills for 12 months, every meter the owner pays
  • Property tax bills for two years and any pending appeal
  • Service contracts: laundry, trash, landscaping, elevator, pest, fire monitoringCheck term, assignability and termination fees. Laundry leases are the usual surprise.
  • Accounts-receivable aging by tenant
  • List of capital expenditures for three to five years with invoices

Leases and tenants

  • Every lease, amendment and renewal, compared to the rent roll line by line
  • Security deposit ledger, and how the jurisdiction requires deposits to be held
  • Tenant estoppel certificates where you can get them
  • Housing-assistance contracts for any subsidized tenants
  • Notices served and eviction cases filed in the last 12 months
  • Concessions and free-rent periods still running
  • Local rent regulation: registration, allowable increases, just-cause rulesConfirm with local counsel. These rules change the rent growth you can underwrite.

The physical building

  • Walk every unit. All of them.
  • Roof: age, type, remaining life, any active leaks
  • Heating plant and domestic hot water: age, fuel, service history
  • Electrical: service size, panel brand, any aluminum branch wiring or knob-and-tube
  • Plumbing: supply and drain material, sewer scope on older buildings
  • Foundation, masonry, porches, stairs and fire escapes
  • Windows, exterior doors and common-area finishes
  • Life safety: smoke and CO detectors, extinguishers, egress, sprinkler or alarm certificates
  • Environmental: lead-based paint disclosure for pre-1978 buildings, asbestos, oil tanks, radon, mold
  • Unit-by-unit turn estimate and a building capital budget

Title, zoning and legal

  • Title commitment and every exception document
  • Survey, or the title company’s survey requirements
  • Zoning confirmation that the unit count is legalAn illegal fifth or third unit is an underwriting problem and an insurance problem.
  • Certificate of occupancy or rental license and the last inspection report
  • Open permits and code violations
  • Pending or threatened litigation

Insurance and taxes

  • Bindable insurance quote at replacement cost, with rent-loss coverage
  • Seller’s loss runs for three to five years
  • Flood zone determination
  • Estimated property tax after the saleIn many jurisdictions a sale triggers reassessment. Underwrite the new bill, not the seller’s.

The loan

  • Lender NOI built from the rent roll and T-12, not the broker’s pro forma
  • DSCR and LTV tested at the rate and structure on the term sheet
  • Reserves and cash to close confirmed against statements
  • Appraisal ordered early; on 5+ units it is a commercial report and takes longer

Legal, zoning, environmental and rent-regulation questions are for a licensed professional in the building’s jurisdiction. This list tells you what to ask; it does not answer it.

A buyer’s diligence and a lender’s underwriting overlap, but they are not the same job. The lender checks that the building supports the loan. You are checking that it supports the price, which is a higher bar. This checklist is the buyer’s version. It is for a first purchase above four units, or for anyone whose last deal turned up a surprise after closing. It sits with the site’s other spreadsheets and checklists.

A four-stage order for the contract period

The checklist groups items by source. Work them in order of cost and lead time, cheapest first.

Stage 1, before or at signing: the document request. Send the seller one written request covering the financial and lease items, with a delivery date in the contract. A seller who cannot produce bank statements behind the T-12 has told you something.

Stage 2, first week: free and fast. Look up the flood zone on FEMA’s Flood Map Service Center. Pull the tax record, open permits and violations from the city or county. Call your insurance agent with the address, year built and roof age. Order the title commitment. If acquisition financing is part of the plan, get the lender the rent roll and T-12 now, since the appraisal on 5+ units is a commercial report with its own queue.

Stage 3, first two weeks: your own eyes. Walk every unit with a contractor and fill in the lease audit worksheet as leases arrive. Price what you saw in the capex workbook.

Stage 4, once stage 3 has not ended the deal: paid reports. Sewer scope, environmental, survey, any specialist the walk-through called for.

The standard behind each outside report

Ask every vendor which standard the report follows. These are the ones lenders and title companies recognize.

ReportStandard or ruleWhat it means for timing
Phase I environmental site assessmentASTM E1527-21, which EPA accepts as meeting its all appropriate inquiries rule (40 CFR Part 312)Done or updated within one year before you take title; interviews, records review, site visit and lien search within 180 days
Lead-based paint (pre-1978 buildings)Federal disclosure rule, Section 1018 of Title XSeller discloses known hazards and reports; buyer gets 10 days to inspect unless changed in writing
Boundary and title survey2026 ALTA/NSPS Minimum Standard Detail RequirementsIn force for surveys begun on or after February 23, 2026; optional Table A items are chosen when you order
Flood zoneFEMA flood insurance rate mapFree lookup; a lender orders the formal determination

Source: EPA, Brownfields All Appropriate Inquiries, updated May 7, 2026, and Real Estate Disclosures about Potential Lead Hazards, updated May 27, 2026; American Land Title Association, ALTA/NSPS Land Title Survey Standards. Accessed November 25, 2026.

Not every small building needs every report. Lender practice varies, and what JFG orders on a given file is underwritten file by file, ask your loan officer. Agency rules give a sense of proportion. On its small loans, Fannie Mae starts with a lighter environmental screening under ASTM E-1528 and orders a full Phase I only when the screening calls for one. On surveys it lets the lender decide whether an as-built survey is needed at all, and when one is used, its survey section looks for a date within 360 days of recording. A former dry cleaner next door or a buried oil tank changes the answer. Environmental and title questions belong with a licensed professional in the building’s state.

Turning a finding into a number

Every finding ends up in one of four places.

  • Price or credit. Deferred work the seller did not disclose, a rent roll that overstates the leases, deposits missing from the ledger. Bring a contractor’s bid or the audit worksheet, not an adjective.
  • Your budget. Items you expected and priced. They change your cash to close, not the contract.
  • The loan. Anything that lowers income or raises expenses lowers the loan. Rebuild NOI with the reassessed tax bill and your own insurance quote in the lender NOI tool, then check that the result still clears 1.20–1.25 at the leverage you need.
  • A reason to stop. An illegal unit that carries the deal, contamination with no clear cleanup cost, a title defect the seller cannot cure.

Insurance deserves its own line. A quote that comes in far above the seller’s premium is a finding, and so is a carrier that declines the building over its wiring or roof. Both show up in NOI. The coverage a lender expects is laid out under multifamily insurance.

What the lender will check again anyway

Expect the lender to repeat three of your checks: the leases against the rent roll, collections against deposits, and the physical condition through the appraiser’s visit. Your diligence does not replace theirs, and theirs does not protect you. A lender can be satisfied with a building at a lower loan amount; you still owe the contract price.

When diligence says this is not a DSCR purchase

Some buildings pass every test except the one that matters for permanent financing: they are not leased. Many DSCR files want about 85–90% or more of the units occupied. If the walk-through shows a third of the apartments empty or unrentable, the checklist has done its job. Reprice the deal as a renovation financed with bridge loans for 5+ unit buildings, with a DSCR loan as the exit once the building is full.

Questions and answers

Do I have to walk every unit of a 12-unit, or is a sample enough?

Walk all twelve. A sample is a lender's shortcut on large properties, and even there the floor is high: on its own loans Fannie Mae has lenders inspect every available unit on 5 to 9 unit buildings, and on larger ones always include units vacant more than 90 days and units that cannot be rented. You are buying every apartment, including the one the seller says is fine.

Does a seller have to let me test a 1960s apartment building for lead paint?

Federal law gives buyers of most pre-1978 housing a 10-day opportunity for a paint inspection or risk assessment, which the parties can lengthen, shorten or waive in writing. The seller must also disclose known lead-based paint and hand over available reports, including records for common areas and other units from building-wide evaluations, according to EPA's summary of the disclosure rule. Ask for those records in your first document request.

What if the seller cannot produce a certificate of occupancy for one of the units?

Treat that unit's rent as at risk until the city confirms it is legal. Agency practice shows the downside: when no certificate or other evidence can be found, Fannie Mae's guidance tells its lenders to exclude the income from that unit while still counting its expenses. Check zoning, the rental license and permit history, and ask your insurance agent whether a loss starting in that unit would be covered.

Can I reuse the seller's old survey or environmental report to save money?

Sometimes for the survey, rarely for the environmental report. A title company may accept an existing survey with an affidavit that nothing has changed. A Phase I is different: EPA's all appropriate inquiries rule requires the work to be done or updated within one year before you take title, with interviews, records review, the site visit and lien search inside 180 days. An older report is background reading only.

Who pays for due diligence reports if I walk away from the deal?

Normally you do. Inspection, environmental, survey and appraisal fees are paid to the firms that did the work, whether or not you close, and your earnest money is governed separately by the contract. That is the reason to sequence the work: do the free checks first, and order the expensive reports once the leases and the unit walk have not killed the deal.

Sources

  1. Brownfields All Appropriate Inquiries. U.S. Environmental Protection Agency, 2026-05-07.
  2. Real Estate Disclosures about Potential Lead Hazards. U.S. Environmental Protection Agency, 2026-05-27.
  3. ALTA/NSPS Land Title Survey Standards. American Land Title Association, 2026.
  4. Multifamily Guide, Part II, Chapter 3, Section 305.02: Survey. Fannie Mae, 2026.
  5. Multifamily Guide, Part II, Chapter 4, Section 402: Site Inspections. Fannie Mae, 2026.
  6. Multifamily Guide, Part II, Chapter 1, Section 108: Certificates of Occupancy. Fannie Mae, 2026.
  7. Multifamily Guide, Part III, Chapter 9, Section 909: Environmental Matters and Inspections (Small Mortgage Loans). Fannie Mae, 2026.
  8. FEMA Flood Map Service Center. Federal Emergency Management Agency, 2026.