4-vs-5-Unit Financing Comparer
The 4-vs-5-Unit Financing Comparer takes one set of per-unit numbers and underwrites it twice: as a fourplex on gross rent over PITIA, and as a five-unit on NOI over annual debt service. It opens at 85% LTV for four units and 75% for five, and shows both DSCRs and both down payments.
| Gross monthly rent (4 units) | $6,000 |
|---|---|
| Principal and interest on $561,000 at 7% | $3,732 |
| Property taxes | $700 |
| Insurance | $283 |
| PITIA | $4,715 |
| DSCR = rent / PITIA | 1.27 |
| Down payment at 85% LTV | $99,000 |
| Gross scheduled rent (5 units, annual) | $90,000 |
|---|---|
| Vacancy and credit loss at 5% | − $4,500 |
| Effective gross income | $85,500 |
| Property taxes | $10,500 |
|---|---|
| Insurance | $4,250 |
| Owner-paid utilities | $3,500 |
| Repairs and maintenance | $4,500 |
| Management at 4% of collected income | $3,420 |
| Replacement reserves at $250 per unit | $1,250 |
| Total operating expenses30.5% of gross scheduled rent | $27,420 |
| Effective gross income | $85,500 |
|---|---|
| Total operating expenses | − $27,420 |
| Net operating income (NOI) | $58,080 |
| Annual debt service on $618,750 at 7.375% | $51,283 |
|---|---|
| DSCR = NOI / annual debt service | 1.13 |
| Down payment at 75% LTV | $206,250 |
- Rates of 7% and 7.375% are inputs for the math, not offers.
- Per-unit rent, price, taxes and insurance are held equal so only the underwriting method changes.
- Published minimums: 1.0–1.25 on 2-4 units by product, 1.20–1.25 on 5-10 units.
The comparer is for the moment you are looking at two listings, one with four units and one with five, at about the same price and rent per unit. It strips out everything that differs between the buildings except the unit count, so the only thing left on screen is what the change in underwriting method does to coverage and cash.
Two formulas, one set of per-unit numbers
Four units: gross rent over PITIA.
- Loan = 4 × price per unit × LTV on 4 units
- PITIA = monthly principal and interest + (4 × taxes per unit ÷ 12) + (4 × insurance per unit ÷ 12)
- DSCR = (4 × monthly rent per unit) ÷ PITIA
Five units: NOI over annual debt service.
- Gross scheduled rent = 5 × monthly rent per unit × 12
- Effective gross income = gross scheduled rent − vacancy
- NOI = effective gross income − taxes − insurance − utilities − repairs − management fee − reserves
- Loan = 5 × price per unit × LTV on 5 units
- DSCR = NOI ÷ (12 × monthly principal and interest)
Both payments use a 30-year amortization. The division at five units is not arbitrary. Fannie Mae’s single-family rules cover dwellings of one to four units, and its multifamily guide requires a property with at least 5 dwelling units. The CFPB’s Regulation Z definitions draw the same boundary, defining a dwelling as a residential structure of one to four units. For the full account of the switch at 5 units, read that answer page. This page sticks to the instrument.
The comparer’s fields and their starting values
Per-unit economics (used on both sides): monthly rent, price, annual property taxes and annual insurance. Enter the taxes you expect after the sale.
Five-unit expenses (used on one side only): owner-paid utilities, repairs and replacement reserves, each per unit per year, plus two percentages. Vacancy opens at 5%, the low end of 5–7%. Management opens at 4%, the low end of 4–6%. The reserve figure is your assumption, since JFG’s amount is underwritten file by file, ask your loan officer.
Loan. LTV on four units opens at 85%, the published purchase limit for 2-4 units. LTV on five units opens at 75%, the top of the 70–75% range for 5-10 units. The two rate fields are yours, and the five-unit rate opens slightly above the four-unit rate.
Every default favors neither side: each is the most generous published figure for its own unit count. If the five-unit still looks worse, that is the method talking, not a thumb on the scale.
One run: $1,825 rents at $215,000 a door
$1,825 a month and $215,000 a door, underwritten as four units and as five
| Gross monthly rent (4 units) | $7,300 |
|---|---|
| Principal and interest on $731,000 at 6.75% | $4,741 |
| Property taxes | $1,033 |
| Insurance | $383 |
| PITIA | $6,157 |
| DSCR = rent / PITIA | 1.19 |
| Down payment at 85% LTV | $129,000 |
| Gross scheduled rent (5 units, annual) | $109,500 |
|---|---|
| Vacancy and credit loss at 5% | − $5,475 |
| Effective gross income | $104,025 |
| Property taxes | $15,500 |
|---|---|
| Insurance | $5,750 |
| Owner-paid utilities | $4,750 |
| Repairs and maintenance | $5,500 |
| Management at 4% of collected income | $4,161 |
| Replacement reserves at $275 per unit | $1,375 |
| Total operating expenses33.8% of gross scheduled rent | $37,036 |
| Effective gross income | $104,025 |
|---|---|
| Total operating expenses | − $37,036 |
| Net operating income (NOI) | $66,989 |
| Annual debt service on $806,250 at 7.25% | $66,001 |
|---|---|
| DSCR = NOI / annual debt service | 1.01 |
| Down payment at 75% LTV | $268,750 |
- Rates of 6.75% and 7.25% are inputs for the math, not offers.
- Per-unit rent, price, taxes and insurance are held equal so only the underwriting method changes.
- Published rate range: 5.75%–10.5% (as of August 2026).
As a fourplex, $7,300 of monthly rent against a $6,157 PITIA gives a DSCR of 1.19, above the low end of the 1.0–1.25 minimum, which varies by 2-4 unit product. The loan is $731,000 at 85% and the down payment is $129,000.
As a five-unit, the same rent per door produces $109,500 of scheduled rent, but $37,036 of underwritten expenses comes off before the ratio is run. NOI is $66,989 against $66,001 of debt service: a DSCR of 1.01, short of the 1.20–1.25 minimum. The down payment at 75% is $268,750, which is $139,750 more than the fourplex.
Read that carefully. The five-unit is not a worse building. At the top LTV it is asked to carry a loan its NOI cannot cover, so the real loan would be smaller and the cash larger than the screen shows.
What the four headline numbers are telling you
- DSCR on 4 units. Shown as passing at 1.00 or above. Products inside the 1.0–1.25 range differ, so a result near the bottom narrows your options.
- DSCR on 5 units. Shown as passing at 1.20 or above, the low end of 1.20–1.25. Below it, lower the five-unit LTV field until the ratio clears. The LTV where it clears is your realistic leverage.
- Down payment, 4 units and Down payment, 5 units. Price minus loan on each side, before closing costs and reserves. Part of the gap is one more unit of price. The rest is the lower LTV.
Do not compare the two DSCR figures with each other. The same ratio on rent over PITIA and on NOI over debt service describes different amounts of safety, because the first has no expenses in it. Compare each with its own minimum.
Where the comparer stops
It assumes two buildings that are identical per unit, which real listings never are. A fifth unit carved from a basement rarely rents like the other four. The comparer also:
- sizes the five-unit loan at the LTV you type, and does not solve for the largest loan that passes. Take the five-unit NOI to the DSCR and loan-size tool for that.
- uses one flat set of five-unit expenses. To build them line by line from a real statement, run your own lender NOI.
- leaves out appraisal type and cost, closing costs, reserves, the prepayment schedule and document requirements, all of which change at the five-unit line.
- models purchases only, with no interest-only option.
After the comparison
If the four-unit side wins, the next read is the page on financing a fourplex, and JFG’s DSCR calculator will rerun the rent-over-PITIA ratio on the actual building. If the five-unit side holds up at a realistic LTV, review JFG’s 5-10 unit program page.
Either way, take the list of questions to ask a lender into the first call, so you learn early which minimum and which LTV your file would be held to. The comparer is one of all nine tools here.
Questions and answers
Why does the comparer ask for utilities, repairs and reserves but only use them on the five-unit side?
Because only the five-unit test has a place for them. A four-unit DSCR loan compares gross rent with PITIA: principal, interest, taxes, insurance and association dues. Operating costs never enter that ratio. At five units the lender builds NOI, and every operating line, plus a 5–7% vacancy factor and a 4–6% management fee, comes off the rent first. The comparer reproduces that asymmetry on purpose. You still pay those costs on a fourplex. The loan test just ignores them.
Why are there two rate fields in the 4-vs-5-unit comparer?
The two buildings are priced as different loans, so a single rate would hide part of the difference. Both fields are your assumptions and neither is a quote. The published range for the program as a whole is 5.75%–10.5% (as of August 2026). Enter the same rate on both sides when you want to isolate the effect of the underwriting method, then enter each side's quoted rate once you have term sheets.
The comparer shows my five-unit as passing at 1.22. Will every five-unit loan accept that?
Not necessarily. The comparer colors the five-unit result as passing at 1.20, the low end of the published 1.20–1.25 minimum. Where a specific file lands inside that range is underwritten file by file, ask your loan officer. A result between the two ends is a maybe, so plan on the higher figure until a lender tells you otherwise.
Can the comparer model a fourplex I already own against a five-unit I want to buy?
Not directly. It prices both sides as purchases at one price per unit and one rent per unit, so two real buildings with different rents will not fit. Use it to learn how far apart the two tests land on comparable economics. Then run each real building through the calculator built for its unit count.
Does the comparer include association dues in the fourplex payment?
No. The four-unit payment is principal and interest plus one-twelfth of annual taxes and insurance. If the fourplex sits in a condominium or planned community with monthly dues, the real PITIA is higher and the real DSCR lower than the comparer shows. To approximate the effect, add the dues to the insurance field as an annual per-unit amount and read only the four-unit result from that run, since the same field also feeds the five-unit expenses.
Sources
- Selling Guide B2-3-01, General Property Eligibility. Fannie Mae, 2025-09-03.
- Multifamily Selling and Servicing Guide, Part II, Chapter 1, Section 101: Eligible Properties. Fannie Mae, 2026.
- Regulation Z, 12 CFR 1026.2, Definitions and Rules of Construction. Consumer Financial Protection Bureau, 2026.